• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer
Central Texas Lakes Real Estate home
(830) 556-3505 | Login / Register
  • Search
    • Search All Listings
    • Featured Listings
    • Market Reports
    • New Listing Alerts
  • Lake Lots
  • Lake Houses
  • About
    • About Me
    • Testimonials
  • Contact
  • Home
  • Search
    • Search All Listings
    • Featured Listings
    • Market Reports
    • New Listing Alerts
  • Lake Lots
  • Lake Houses
  • Buyers
    • Buying a Home
    • Why Buy with Me
  • Sellers
    • Selling Your Home
    • Home Valuation
  • Blog
  • About
    • About Me
    • Testimonials
  • Contact

Dock Permits on Lake McQueeney: GBRA’s New $600 Fee (2026)

October 19, 2026 by James Walker

By Jordan Lippe Walker, Keller Williams Realty Heritage

Planning to build or change a dock on Lake McQueeney? You need a Lake McQueeney dock permit from GBRA before work starts. Since Sept. 1, 2026, that means GBRA’s Dock Construction Permit application plus a $600 fee. The same rule covers Lake Dunlap and Lake Placid, per GBRA’s Hydrolakes page.

Who’s in charge?

The Guadalupe-Blanco River Authority (GBRA) owns and runs the lake and its dam. If you own land next to a GBRA hydroelectric lake, you need GBRA approval before you build or modify a dock or other waterfront structure.

GBRA approves the location only. You still need any other permits that apply, such as Guadalupe County’s floodplain permit.

Does my project need a permit?

Project GBRA permit? $600 fee?
New dock, boathouse, pier, boat slip, retaining wall, ramp or anchored swim platform Yes Yes
Modification (a change to the location, layout, structure or substructure) Yes Yes
Adding a structure your permit didn’t include Yes, a new permit Yes
Building fewer or smaller structures than permitted, no farther from shore No new permit No
Demolition Yes No
Routine or preventative maintenance No, but tell GBRA No

Source: GBRA permit form.

Boat lifts on Lake McQueeney sit inside boathouses, so treat a lift as part of the boathouse on your application.

How to apply for a GBRA dock permit

  1. Get other approvals first. The form lists the City of Seguin, Guadalupe County, the City of New Braunfels, Comal County, Gonzales County, Texas 811 utility locates and the U.S. Army Corps of Engineers. For each, show the approval or mark it “not required.”
  2. Fill out the form. List the owner, contractor and any agent, plus your property ID or deed number.
  3. Attach plans. Show the scope of work, measurements and property lines.
  4. Email it and pay. Send it to dockpermits@gbra.org with the $600 payment. GBRA’s Hydrolakes page has a payment link.
  5. Wait for approval. No work can start until GBRA issues the permit.

GBRA’s key building rules

GBRA’s form sets a short list of standards:

  • Pier length. Piers can’t reach more than 20 feet into the water. GBRA can set a shorter limit.
  • Low water. The structure must hold up if the lake drops as much as 12 feet. It should also handle high and fast water.
  • Open sides. No dock or structure can be enclosed on the wall sides. Keep that in mind when you plan a Lake McQueeney boathouse.
  • Neighbors. Don’t block a neighbor’s land or water access to their structures.
  • Lighting. A licensed professional must install any wired lighting.
  • Deadline. Finish within 12 months of approval, or the permit is void. GBRA may allow more time for weather or other delays.

Other building specs come from the county, city or state. Where rules differ, the stricter one wins.

Keep it in good shape

You must keep the dock in “good and sound condition.” Loose decking or roofing, broken or missing parts and general disrepair don’t pass. If GBRA notifies you, you have 60 days to fix it or you can lose the permit.

GBRA can also require removal of an unpermitted structure, void a permit or seek a court order.

The county floodplain permit

Guadalupe County requires a Floodplain Development Permit for work in a regulated flood zone, including boat docks and retaining walls. Its application has a shoreline section for docks, boathouses, piers, boat lifts and slips.

The fee is $300, and building without a permit costs double, per the county’s fee schedule. The county inspects before, during and after construction.

Building in, dredging or filling certain waters may also need a Corps of Engineers permit.

Buying a home with a dock

Check the dock before you buy:

  • Ask for paperwork. Request the seller’s GBRA permit and any county floodplain permit.
  • Look at condition. Compare the dock to GBRA’s “good and sound” standard. A dock inspection can help.
  • Check the flood zone. Look up the lot on the county’s floodplain map.
  • Know how the permit works. The permit covers construction, not ownership. If a home sells while a dock project is still underway, the permit can transfer to the buyer, and the seller must tell GBRA about the sale. A finished dock doesn’t need a new permit just because the home changes hands.

Our waterfront buyer’s guide covers more, and you can browse Lake McQueeney homes for sale. See also our Lake McQueeney Dam guide and property tax guide.

Get new Lake McQueeney listings first

Want to know the day a waterfront home or lot hits the market? Sign up for free Lake McQueeney listing alerts. You can also browse Lake McQueeney homes for sale and Lake McQueeney lots for sale.

Thinking about selling? Find out what your lake home is worth.

FAQ

Is the GBRA dock permit only for Lake McQueeney?

No. The application and $600 fee also apply on Lake Dunlap and Lake Placid.

Do I need a permit to repair my dock?

Not for routine or preventative maintenance, but you must tell GBRA. Changing the location, layout, structure or substructure is a modification and needs a permit.

Does GBRA approve my dock design?

No. GBRA approves or denies the location only. It doesn’t certify the design or construction.

Do I need a new permit when I buy a home with a dock?

No. The permit is for construction. A finished dock doesn’t need a new permit when the home sells. If the sale happens mid-project, the permit can transfer to the new owner.

Can I start building and apply later?

No. GBRA requires approval before work starts, and the county charges double for floodplain work done without a permit.

The fine print

  • Effective date: “Effective September 1, 2026, completion of the Dock Construction Permit application and permit fee (Lake Dunlap, Lake McQueeney, and Lake Placid) is required,” per GBRA’s Hydrolakes page.
  • Fee: $600, due with the application. Demolition has no fee. An earlier GBRA form (May 2024) listed the $600 fee and a $100 annual fee as “currently waived.” The current form (Aug. 27, 2026) lists only the $600 fee.
  • Structure types on the form: retaining wall, piers, boat slips, dock, boat house, boat launch ramps, jet ski ramp, and anchored swim pads, platforms, water trampolines or inflatables, plus “other.”
  • Modification, per GBRA: “any change, addition or alteration in the location, configuration, structure or substructure” of a structure, or one that affects its safety.
  • Transfer wording, quoted in full: “this permit may not be assigned or sold but it may be transferred to a subsequent property owner. Owner is responsible for notifying GBRA in the event said property is sold and agrees to notify subsequent owners of the property of the obligation to obtain a new permit.”
  • Flood risk: the form says the structure is in a flood-prone area and the owner must follow GBRA and law-enforcement evacuation orders.
  • Dredging: no dredging or disposal of fill or spoils except as the law allows. GBRA can void the permit for violations.
  • Abandonment: if work isn’t finished in 12 months and you haven’t asked for more time, GBRA can call the project abandoned and require removal at your expense.
  • County contact: Guadalupe County Environmental Health, 310 IH 10 W, Seguin. (830) 303-8858, Flood-Permits@guadalupetx.gov. If work goes on during a county stop-work order, the owner and contractor can be ticketed for a Class C misdemeanor, per the county’s permit process.
  • GBRA can change its form and rules. Check the current version before you apply. This isn’t legal advice.

Filed Under: Home Buyers

Primary Sidebar

Agent Name

Area SpecialistJordan Lippe Walker

(830) 556-3505 Contact Jordan
Listing Alerts Market Reports Your Home's Value

Testimonials

"She understands house visits and will point out issues with the house and help you through the home buying process. She cares about the customer finding..." view testimonials
- John O.
View All

Get In Touch

This field is for validation purposes and should be left unchanged.
Name(Required)
End of Modal

Contact Details

Questions about the market? Wondering what your home is worth? We're here for all your real estate needs, just a message away!

Jordan Lippe Walker
(830) 556-3505
Email

Keller Williams Realty Heritage
8610 FM 725
McQueeney, TX 78123

Get In Touch

This field is for validation purposes and should be left unchanged.
Name(Required)
End of Modal

Contact MeWork With a Local Expert

Whether you are buying or selling, your real estate needs are unique to you. As your local real estate expert I am here to be your guide. Contact me today - I'm here to help.

Contact Me

Footer

Jordan Lippe WalkerTexas Realtor

(830) 556-3505|8610 FM 725, McQueeney, TX 78123 |Contact Jordan
company logo
Equal Housing logo

Download Our IABS Form   •  Consumer Protection Notice
sitemap   •   privacy policy   •   admin   •   ©2026 All Rights Reserved  •  Real Estate Website Design opens in new window by IDXCentral.com

Texas law requires all real estate license holders to give the following information about brokerage services to prospective buyers, tenants, sellers and landlords.